Dedicated GPUs · two pod sizes
Dedicated B200 GPUs on a farm in Iceland.
Snow builds AI pods on Icelandic farms. You get whole GPU servers that are yours alone, on renewable power, with your data kept in the EEA. The servers' heat warms the farm's greenhouse.
- 72–168 NVIDIA B200 GPUs a pod
- 100 % renewable power
- EEA data stays in Iceland
- $3.60 per GPU-hour on 5 years
Reserve capacity
Choose what you need. See the price now.
A reservation is free and does not bind you. It tells us what to build. We reply within one working day.
Sold in whole servers of 8 GPUs. Each server is yours alone, 24/7.
One air-cooled 8-GPU server draws up to about 14 kW. Space, cooling, network and security are included. You pay for power at cost.
Reservation received.
We'll email you within one working day to book a short call. If you need us sooner, write to compute@snowpod.eu.
How it works
From reservation to running jobs
We build a pod only when its customers have signed. That keeps prices low and the pod full.
- ReservePick your GPUs and term on this page. It's free.
- TalkA 20-minute call about your workloads, data rules and start date.
- Letter of intentA one-page letter that holds your GPUs and your price.
- ContractSign the contract and pay 3 months up front. That money covers your last 3 months.
- BuildWe order the servers and build the pod. It takes about 5 months.
- Go liveYour servers are tested at full load, then handed to you.
The pod
What you get
Renewable power
Iceland makes almost all its electricity from water and geothermal heat. Your jobs run on it.
Cool air all year
Outside air cools the servers. Iceland's summer rarely gets warm, so the fans do most of the work.
Heat that gets used
The servers' heat warms the farm's greenhouse. Less heat goes to waste and the farm grows more food.
Data in the EEA
Iceland follows GDPR as part of the EEA. Your data and models stay in the pod unless you move them.
Locked and watched
The pod is sealed, alarmed and monitored 24/7, with gas fire suppression that does not harm servers.
Yours alone
Whole servers, not slices. No other customer runs on your GPUs.
Floor plan
AI Pod XS · 20 ft, seen from above. Sizes in millimetres.
Scroll sideways to see the whole pod.
| AI Pod XS · 20 ft | AI Pod · 40 ft | |
|---|---|---|
| GPUs | 72 × NVIDIA B200, 180 GB each | 168 × NVIDIA B200, 180 GB each |
| Servers | 9 × HGX B200, 8 GPUs each | 21 × HGX B200, 8 GPUs each |
| Cooling | Outside air | Liquid, direct to the chip |
| GPU network | NVIDIA Spectrum-4 800G Ethernet, one SN5600 switch | NVIDIA Spectrum-4 800G Ethernet, two SN5600 switches |
| Power | About 140 kW at full load | About 270 kW at full load |
| Heat to the farm | Warm air for a greenhouse or barn | Hot water at about 53 °C |
| Bring your own | Up to 3 racks, about 43 kW each, air-cooled | Up to 7 racks, about 35 kW each, liquid-cooled |
| Both | Dual-fed racks, S3-compatible storage, 10 Gbit/s fibre with 4G backup, on a farm in Iceland | |
Questions
Before you reserve
Is a reservation a contract?
No. It costs nothing and you can cancel it with one email. Only the contract you sign later is binding.
Why are the prices this low?
Power in Iceland is cheap and clean, outside air does the cooling, and we only build once a pod is sold. Longer contracts get lower prices because they pay for the servers over their life.
When can I start?
About 5 months after the contracts are signed, for either pod size.
Can I try the GPUs first?
Yes. Ask us for on-demand hours before you sign a longer term.
What is the price in euros?
Prices are set in US dollars, the usual currency for GPUs. We can invoice in euros at the rate on the day you sign.
What happens to the heat?
In the 20 ft pod, warm air is ducted to the greenhouse. In the 40 ft pod, the servers are cooled with liquid and the heat reaches the greenhouse as hot water through buried pipes. The farm hosts the pod and gets paid for the land.
Rather talk first?
Email us and we'll find 20 minutes this week for a call.